Summary: |
The Project of JET-EP/NB/3; Full Energy ion dump design JET-EP/NB/4; Rotary valve design JET-EP/NB/5; SF6 Tower design JET-EP/NB/6 Transmission line JET-EP/NB/8 Characterisation of RF PINI on IPP Test |
|
Sector: |
Energy, Power and Electrical |
|
|
Notice Type: |
Project Information |
Deadline: |
31 Dec 2030 |
|
|
|
Summary: |
The Project of EB welding of VV sectors and coil cases using filer wire additions ion beam analysis of JET wall tiles and comparison with SIMS data.
Project cost: 143500 EURO
Project Funding: 28 |
|
Sector: |
Energy, Power and Electrical |
|
|
Notice Type: |
Project Information |
Deadline: |
31 Dec 2031 |
|
|
|
Summary: |
EFDA JET experimental campaign 2002 amendment 2
|
|
Sector: |
Industrial Automation and Control |
|
|
Notice Type: |
Project Information |
Deadline: |
28 Feb 2057 |
|
|
|
Summary: |
The key objective of this work is to promote and disseminate innovative energy technologies and best practice throughout Europe to support the development of an efficient, environmentally friendly and |
|
Sector: |
Energy, Power and Electrical |
|
|
Notice Type: |
Project Information |
Deadline: |
17 Apr 2031 |
|
|
|
Summary: |
The project of Sludge for heat.
|
|
Sector: |
Energy, Power and Electrical |
|
|
Notice Type: |
Project Information |
Deadline: |
19 May 2031 |
|
|
|
Summary: |
The Project of Solar air conditioning system using very low cost variable plastic ejector, with hybrid potential for different markets.
Project cost: 1366140 EURO
Project Funding: 683070 EURO
|
|
Sector: |
Energy, Power and Electrical |
|
|
Notice Type: |
Project Information |
Deadline: |
25 Jan 2065 |
|
|
|
Summary: |
The reduction in emissions and energy usage through the development of a highly efficient impeller for use in fuel cells.
Project cost: 1177507 EURO
Project Funding: 584570 EURO
Duration: 720 |
|
Sector: |
Energy, Power and Electrical |
|
|
Notice Type: |
Project Information |
Deadline: |
31 Aug 2065 |
|
|
|
Summary: |
Minimizing the temperature of Building Integrated PV to increase electrical output. It is estimated that an average BIPV cell operates at a temperature of up to 10 degrees C above that which could be |
|
Sector: |
Energy, Power and Electrical |
|
|
Notice Type: |
Project Information |
Deadline: |
26 Apr 2076 |
|
|
|
Summary: |
The main objective of this accompanying measure involves making available a standard methodology, user-friendly software tool and case study material for analysing the greenhouse gas balances and subs |
|
|
|
Notice Type: |
Project Information |
Deadline: |
15 Apr 2048 |
|
|
|
Summary: |
The primary objective of the proposed Accompanying Measure is to quantify the scope for EU industry to cooperate with their Chinese counterparts for the provision of technology and services to improve |
|
Sector: |
Energy, Power and Electrical |
|
|
Notice Type: |
Project Information |
Deadline: |
02 Jan 2063 |
|
|
|