Summary: |
United Arab Emirates : Hassyan Power & Desalination Station Project |
|
Sector: |
Energy, Power and Electrical |
|
Country : |
United Arab Emirates |
|
|
|
Notice Type: |
Project Information |
Deadline: |
31 Mar 2023 |
|
|
|
Summary: |
Saudi Arabia : Jeddah South Power Plant Project |
|
Sector: |
Energy, Power and Electrical |
|
|
Notice Type: |
Project Information |
Deadline: |
30 Jun 2022 |
|
|
|
Summary: |
Metsamor New Nuclear Plant Project (Metsamor 2) |
|
Sector: |
Non-Renewable Energy |
|
|
Notice Type: |
Project Information |
Deadline: |
31 Dec 2023 |
|
|
|
Summary: |
Kusile Power Station |
|
Sector: |
Non-Renewable Energy,Energy, Power and Electrical |
|
|
Notice Type: |
Project Information |
Deadline: |
31 Dec 2023 |
|
|
|
Summary: |
4,320 MW-Dasu Hydropower Project |
|
|
|
Notice Type: |
Project Information |
Deadline: |
31 Dec 2022 |
|
|
|
Summary: |
China: Guangrun Hydropower Project |
|
Sector: |
Energy, Power and Electrical |
|
|
Notice Type: |
Project Information |
Deadline: |
31 Dec 2029 |
|
|
|
Summary: |
The partners will demonstrate and optimize a novel CHP plant based on biomass gasification on a full scale (13 MW thermal input). In this plant two biogas fueled engines produce electricity (4 MWe) fr |
|
Sector: |
Energy, Power and Electrical |
|
|
Notice Type: |
Project Information |
Deadline: |
29 May 2025 |
|
|
|
Summary: |
Demonstrating the technical and economic viability of our 15MWe thermal solar- only power plant -technically close to stand-alone operation- by 24hrs/day grid- connected operation thanks to its built- |
|
Sector: |
Energy, Power and Electrical |
|
|
Notice Type: |
Project Information |
Deadline: |
26 Apr 2025 |
|
|
|
Summary: |
The main objectives of this project are twofold:
i) to develop, within a network of European research institutes, a methodology for identifying a potential micro-macro gap in energy security;
ii) to |
|
Sector: |
Energy, Power and Electrical |
|
|
Notice Type: |
Project Information |
Deadline: |
16 Dec 2032 |
|
|
|
Summary: |
Elaborate the first European guide on sustainable urban planning according the revision of the master plans adopted at ParcBIT (Palma de Mallorca) Kronsberg (Hannover) and Leidsche Rijn (Utrecht). The |
|
Sector: |
Energy, Power and Electrical |
|
|
Notice Type: |
Project Information |
Deadline: |
21 Jun 2030 |
|
|
|