Summary: |
The project of Magnetic field compatibility of components and devices for low voltage electrical distribution boards; electromechanical devices and a complete low voltage distribution board.
Projec |
|
Sector: |
Energy, Power and Electrical |
|
|
Notice Type: |
Project Information |
Deadline: |
30 Nov 2037 |
|
|
|
Summary: |
The main objective of this project is to design, construct, monitor and demonstrate a 1.2MW photovoltaic (PV) power plant located on a sloping ground and with an innovative solar active tracking syste |
|
Sector: |
Energy, Power and Electrical |
|
|
Notice Type: |
Project Information |
Deadline: |
30 Jul 2072 |
|
|
|
Summary: |
Dissemination in Bulgaria and Romania of information, concerning modern EU technology for biomass based energy production. Such an information campaign will create conditions for biomass energy applic |
|
Sector: |
Energy, Power and Electrical |
|
|
Notice Type: |
Project Information |
Deadline: |
07 May 2029 |
|
|
|
Summary: |
The main problems addressed by the CAFENOW project are:
- Within the next year, how to fit with the 325ppm NO_x, emission limit of the current regulation up to 2008 with existing DeNO_x equipments in |
|
Sector: |
Energy, Power and Electrical |
|
|
Notice Type: |
Project Information |
Deadline: |
23 Oct 2080 |
|
|
|
Summary: |
Minimizing the temperature of Building Integrated PV to increase electrical output. It is estimated that an average BIPV cell operates at a temperature of up to 10 degrees C above that which could be |
|
Sector: |
Energy, Power and Electrical |
|
|
Notice Type: |
Project Information |
Deadline: |
26 Apr 2076 |
|
|
|
Summary: |
Nepal: West Seti Hydropower Project in Nepal |
|
|
|
Notice Type: |
Project Information |
Deadline: |
30 Apr 2021 |
|
|
|
Summary: |
FRANCE--Cost abatement for effective Nox reduction in PF coal-fired power plants |
|
Sector: |
Energy, Power and Electrical |
|
|
Notice Type: |
Project Information |
Deadline: |
23 Oct 2080 |
|
|
|
Summary: |
NETHERLANDS-R&d and Demonstration of an Intelligent Power and Data Transmitting Composite Coiled Tubing for the Exploration of Hydrocarbons |
|
Sector: |
Energy, Power and Electrical |
|
|
Notice Type: |
Project Information |
Deadline: |
10 Jul 2081 |
|
|
|
Summary: |
UNITED KINGDOM-Design guide for building integrated Pv to minimise temperature and increase electrical output |
|
Sector: |
Energy, Power and Electrical |
|
|
Notice Type: |
Project Information |
Deadline: |
26 Apr 2076 |
|
|
|
Summary: |
UNITED KINGDOM-Technology impacts on load profiling for tariff development end deregulated European electricity markets |
|
Sector: |
Energy, Power and Electrical |
|
|
Notice Type: |
Project Information |
Deadline: |
12 Jan 2079 |
|
|
|