Summary: |
United Arab Emirates : Hassyan Power & Desalination Station Project |
|
Sector: |
Energy, Power and Electrical |
|
Country : |
United Arab Emirates |
|
|
|
Notice Type: |
Project Information |
Deadline: |
31 Mar 2023 |
|
|
|
Summary: |
4,320 MW-Dasu Hydropower Project |
|
|
|
Notice Type: |
Project Information |
Deadline: |
31 Dec 2022 |
|
|
|
Summary: |
The Project of Refrigeration, heating and air-conditioning using an absorption refrigeration system heated by transparent insulated solar collectors. |
|
Sector: |
Energy, Power and Electrical |
|
|
Notice Type: |
Project Information |
Deadline: |
29 Sep 2063 |
|
|
|
Summary: |
The main objective of this project is to design, construct, monitor and demonstrate a 1.2MW photovoltaic (PV) power plant located on a sloping ground and with an innovative solar active tracking syste |
|
Sector: |
Energy, Power and Electrical |
|
|
Notice Type: |
Project Information |
Deadline: |
30 Jul 2072 |
|
|
|
Summary: |
ANDASOL s main objective is the implementation of a privately owned and financed 50 MWe solar thermal power plant that will produce annually 181.7 GWhe of clean, emission-free solar electricity in Sou |
|
Sector: |
Energy, Power and Electrical |
|
|
Notice Type: |
Project Information |
Deadline: |
13 Feb 2021 |
|
|
|
Summary: |
The Project of Novel battery for solar system.
Project cost: 1151377 EURO
Project Funding: 575685 EURO
Duration: 720 months
Start date: 2004-07-08
End date: 2064-07-07 |
|
Sector: |
Energy, Power and Electrical |
|
|
Notice Type: |
Project Information |
Deadline: |
07 Jul 2064 |
|
|
|
Summary: |
The "electricity from renewable energy sources" (RES-e) Directive requires Member States to take legal action. However, achieving the RES-e targets will require a strong technological stimulus to boos |
|
Sector: |
Energy, Power and Electrical |
|
|
Notice Type: |
Project Information |
Deadline: |
27 Mar 2038 |
|
|
|
Summary: |
The Project of Energy peak-shaving system for elevators.
Project cost: 1047350 EURO
Project Funding: 523675 EURO
Duration: 720 months
Start date: 2003-02-25
End date: 2063-02-24 |
|
Sector: |
Energy, Power and Electrical |
|
|
Notice Type: |
Project Information |
Deadline: |
24 Feb 2063 |
|
|
|
Summary: |
The Project of Solar air conditioning system using very low cost variable plastic ejector, with hybrid potential for different markets.
Project cost: 1366140 EURO
Project Funding: 683070 EURO
|
|
Sector: |
Energy, Power and Electrical |
|
|
Notice Type: |
Project Information |
Deadline: |
25 Jan 2065 |
|
|
|
Summary: |
Demonstrating the technical and economic viability of our 15MWe thermal solar- only power plant -technically close to stand-alone operation- by 24hrs/day grid- connected operation thanks to its built- |
|
Sector: |
Energy, Power and Electrical |
|
|
Notice Type: |
Project Information |
Deadline: |
26 Apr 2025 |
|
|
|